| Foliar fertilization | Dose per hl of water | Dose per hectar |
| Orchards and actinidia |
g 70-80 |
g 1000 |
| Vine and olive |
g 80-90 |
g 1000 |
| Horticultural |
g 50-60 |
g 600-800 |
| Floriculture |
g 30-50 |
g 500 |
| Tree nursery |
g 60-70 |
g 700-800 |
| Industrial crops |
g 70-80 |
g 600-800 |
| Beet |
– |
g 800-1000 |
BORSPEED must be applied to plants at the first boron deficiency stage. The product must be dissolved in the water at the indicated dosage with 2-3 treatments every 10-15 days, according to the crops needs. (on fruiting plants, vine, actinidia and olive the best results can be reached before and after flowering and during buds differentiation).